Shahid Beheshti University
Today   Login  Farsi
Mostafa Zandieh
Associate professor

Faculty: Management and Accounting
Department: Industrial Management
Phone: 29905215
Email: m_zandieh@sbu.ac.ir
Personal website:

Academic Degrees

PhD, , Amirkabir University of Technology, Tehran, 2009.


Journal Articles
1. F. Zaheri, M. Zandieh, M. Taghavifard, "Bi-level Programming for Supplier Selection under Quantity Discount Policy" , SCIENTIA IRANICA, Vol.24, pp.2095-2104, 2017.
2. H. Golpîra, E. Najafi, M. Zandieh, S. Sadi-nezhad, "Robust bi-level optimization for green opportunistic supply chain network design problem against uncertainty and environmental risk" , COMPUTERS INDUSTRIAL ENGINEERING, Vol.107, pp.301-312, 2017.
3. M. Zandieh, A. Khatami, S. Rahmati, "Flexible job shop scheduling under condition-based maintenance Improved version of imperialist competitive algorithm" , APPLIED SOFT COMPUTING, Vol.58, pp.449-464, 2017.
4. M. Zandieh, E. Shokrollahpoor, M. Bagher, "Maximum-weighted tree matching problem a novel discrete invasive weed optimisation algorithm" , International Journal of Intelligent Systems Technologies and Applications, Vol.16, pp.95-105, 2017.
5. M. Zandieh, M. Joreirahmadi, A. Fadaei rafsanjani, "Buffer allocation problem and preventive maintenance planning in non-homogenous unreliable production lines" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.91, pp.2581-2593, 2017.
6. M. Zandieh, M. Roumani, "A biogeography-based optimization algorithm for order acceptance and scheduling" , Journal of Industrial and Production Engineering, Vol.34, pp.312-321, 2017.
7. M. Zandieh, S. Sajadi, R. Behnoud, "Integrated production scheduling and maintenance planning in a hybrid flow shop system-A multi-objective approach" , International Journal of Systems Assurance Engineering and Management, 2017.
8. O. Amirtaheri, M. Zandieh, B. Dorinokorani, A. Moatameni, "A bi-level programming approach for production-distribution supply chain problem" , COMPUTERS INDUSTRIAL ENGINEERING, 2017.
9. S. Khishtandar, M. Zandieh, B. Dorinokorani, "A multi criteria decision making framework for sustainability assessment of bioenergy production technologies with hesitant fuzzy linguistic term sets The case of Iran" , RENEWABLE SUSTAINABLE ENERGY REVIEWS, Vol.77, pp.1130-1145, 2017.
10. S. Mousavi, M. Tavana, N. Alikar, M. Zandieh, "A tuned hybrid intelligent fruit fly optimization algorithm for fuzzy rule generation and classification" , NEURAL COMPUTING APPLICATIONS, 2017.
11. H. Golpira, M. Zandieh, E. Najafi, S. Sadi-nezhad, "A multi-objective multi-echelon green supply chain network design problem with risk-averse retailers in an uncertain environment" , SCIENTIA IRANICA, Vol.24, pp.413-423, 2017.
12. H. Seidgar, M. Zandieh, I. Mahdavi, "An efficient meta-heuristic algorithm for scheduling a two-stage assembly flow shop problem with preventive maintenance activities and reliability approach" , International Journal of Industrial and Systems Engineering, Vol.26, pp.16-41, 2017.
13. S. Khishtandar, M. Zandieh, "Comparisons of some improving strategies on NSGA-II for multi objective inventory system" , Journal of Industrial and Production Engineering, Vol.34, pp.61-69, 2017.
14. S. Mirghaderi, M. Zandieh, "Improving ABC algorithm using new search mechanisms" , International Journal of Intelligent Systems Technologies and Applications, Vol.16, pp.14-31, 2017.
15. V. Kayvanfar, M. Zandieh, E. Teymourian, "An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times a just-in-time approach" , COMPUTATIONAL APPLIED MATHEMATICS, Vol.36, pp.159-184, 2017.
16. E. Shokrollahpoor, F. Hosseinzadeh lotfi, M. Zandieh, "An integrated data envelopment analysis artificial neural network approach for benchmarking of bank branches" , Journal Of Industrial Engineering International, Vol.12, pp.137-143, 2016.
17. H. Poormohammad, M. Zandieh, H. Farsijani, "Ranking factors affecting the quality of banking services using analytic network process" , Decision Science Letters, pp.461-468, 2016.
18. H. Poormohammad, M. Zandieh, H. Farsijani, "The effect of quality of electronic banking services on agility of a bank" , Management science letters, Vol.6, pp.521-534, 2016.
19. H. Seidgar, M. Zandieh, H. Fazlollahtabar, I. Mahdavi, "Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance" , PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, Vol.230, pp.934-953, 2016.
20. H. Seidgar, M. Zandieh, I. Mahdavi, "Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem" , Journal of Industrial and Production Engineering, Vol.33, pp.404-425, 2016.
21. M. Zandieh, "A knowledge-based NSGA-II approach for scheduling in virtual manufacturing cells" , Journal Of Industrial Engineering And Management Studies, Vol.3, pp.89-107, 2016.
22. M. Zandieh, A. Chensebli, "Reverse logistics network design a water flow-like algorithm approach" , OPSEARCH, Vol.53, pp.667-692, 2016.
23. M. Zandieh, M. Abiri, S. Rahmati, "Bi-objective scheduling of flexible flow lines a gradual transition tabu search approach" , Production Engineering, Vol.10, pp.477-488, 2016.
24. O. Amirtaheri, M. Zandieh, B. Dorinokorani, "A bi-level programming model for decentralized manufacturer-distributer supply chain considering cooperative advertising" , SCIENTIA IRANICA, 2016.
25. S. Mousavi, I. Mahdavi, J. Rezaeian, M. Zandieh, "Bi-objective scheduling for re-entrant hybrid flow shop with learning effect and setup times" , SCIENTIA IRANICA, 2016.
26. E. Ahmadi, M. Zandieh, M. Farrokh, S. Emami, "A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms" , COMPUTERS OPERATIONS RESEARCH, pp.56-66, 2016.
27. E. Teymourian, V. Kayvanfar, G. Komaki, M. Zandieh, "Enhanced intelligent water drops and cuckoo search algorithms for solving the capacitated vehicle routing problem" , INFORMATION SCIENCES, pp.354-378, 2016.
28. P. Fattahi, P. Samouei, M. Zandieh, "Simultaneous Multi-skilled Worker Assignment and Mixed-model Two-sided Assembly Line Balancing" , International Journal of Engineering Transactions B Applications, Vol.29, pp.211-221, 2016.
29. E. Yadegari, H. Najmi, M. Ghomi-avili, M. Zandieh, "A Flexible Integrated Forward/ Reverse Logistics Model with Random Path-based Memetic Algorithm" , Iranian Journal Of Management Studies, Vol.8, pp.287-313, 2015.
30. E. Yadegari, M. Zandieh, H. Najmi, "A hybrid spanning tree-based genetic/simulated annealing algorithm for a closed-loop logistics network design problem" , International Journal of Applied Decision Sciences, Vol.8, pp.400-426, 2015.
31. H. Golpira, M. Zandieh, E. Najafi, S. Sadi-nezhade, "Coordination of green supply chain network considering uncertain demand and stochastic CO2 emission level" , Journal Of Industrial Engineering And Management Studies, Vol.2, pp.43-54, 2015.
32. M. Yazdani, M. Zandieh, R. Tavakkoli-moghaddam, F. Jolai, "Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem" , SCIENTIA IRANICA, Vol.22, pp.1242-1257, 2015.
33. M. Zandieh, A. Hashemi, "Group scheduling in hybrid flexible flowshop with sequence-dependent setup times and random breakdowns via integrating genetic algorithm and simulation" , International Journal of Industrial and Systems Engineering, Vol.21, pp.377-394, 2015.
34. B. Naderi, M. Zandieh, "Modeling andscheduling no-wait open shop problems" , INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol.158, pp.256-266, 2014.
35. B. Naderi, M. Zandieh, M. Yazdani, "Polynomial time approximation algorithms for proportionate open-shop scheduling" , INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, Vol.21, pp.1031-1044, 2014.
36. E. Yadegari, M. Ekhtiari, M. Zandieh, A. Alamtabriz, "An Artificial Immune Algorithm for a Closed-Loop Supply Chain Network Design Problem with Different Delivery Paths" , International Journal of Strategic Decision Sciences, Vol.3, pp.27-46, 2014.
37. J. Behnamian, S. Fatemi ghomi, M. Zandieh, "Realistic variant of just-in-time flowshop scheduling-integration of Lp-metric method in PSO-like algorithm" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.75, pp.1787-1797, 2014.
38. M. Asgari tehrani, M. Zandieh, "A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling" , Journal Of Industrial Engineering And Management Studies, Vol.1, pp.1-19, 2014.
39. M. Iranpoor, S. Fatemi ghomi, M. Zandieh, "Order acceptance and due-date quotation in low machine rates" , APPLIED MATHEMATICAL MODELLING, Vol.38, pp.2063-2072, 2014.
40. V. Kayvanfar, G. Komaki, A. Aalaei, M. Zandieh, "Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times" , COMPUTERS OPERATIONS RESEARCH, pp.31-43, 2014.
41. V. Khajehvand, H. Pedram, M. Zandieh, "Multi-objective and Scalable Heuristic Algorithm for Workflow Task Scheduling in Utility Grids" , Journal of Optimization in Industrial Engineering, pp.27-36, 2014.
42. A. Banisadr, M. Zandieh, I. Mahdavi, "A hybrid imperialist competitive algorithm for single-machine scheduling problem w ith linear earliness and quadratic tardiness penalties" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.65, pp.981-989, 2013.
43. A. Nourmohammadi, M. Zandieh, R. Tavakkoli-moghaddam, "An imperialist competitive algorithm for multi-objective U-type assembly line design" , Journal of Computational Science, Vol.4, pp.393-400, 2013.
44. D. Rahmani, M. Heydari, A. Makui, M. Zandieh, "A new approach to reducing the effects of stochastic disruptions in flexible flow shop problems with stability and nervousness" , Scientiae Mathematicae Japonicae, Vol.8, pp.173-178, 2013.
45. I. Mehdi, S. Fatemi ghomi, M. Zandieh, "Due-date assignment and machine scheduling in alow machine-rate situation with stochastic processing times" , COMPUTERS OPERATIONS RESEARCH, pp.1100-1108, 2013.
46. J. Behnamian, M. Zandieh, "Earliness and Tardiness Minimizing on a Realistic Hybrid Flowshop Scheduling with Learning Effect by Advanced Metaheuristic" , ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, Vol.38, pp.1229-1242, 2013.
47. M. Fadaei, M. Zandieh, "Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics" , ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, Vol.38, pp.2233-2244, 2013.
48. V. Khajehvand, H. Pedram, M. Zandieh, "SCTTS Scalable Cost-Time Trade-off Scheduling for Workflow Application in Grids" , KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS, Vol.7, pp.3096-3117, 2013.
49. H. Moradi, M. Zandieh, "An imperialist competitive algorithm for a mixed-model assembly line sequencing problem" , JOURNAL OF MANUFACTURING SYSTEMS, Vol.32, pp.46-54, 2013.
50. S. mousavi, M. Zandieh, M. Yazdani, "A simulated annealing-local search to minimize the makespan and total tardiness on a hybrid flowshop" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.64, pp.369-388, 2013.
51. S. Mousavi, M. Mousakhani, M. Zandieh, "Bi-objective hybrid flow shop scheduling-a new local search" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.64, pp.933-950, 2013.
52. S. Rahmati, M. Zandieh, M. Yazdani, "Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.64, pp.915-932, 2013.
53. A. B., M. Zandieh, S. F., "A cross-docking scheduling problem with sub-population multi-objective algorithms" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.58, pp.741-761, 2012.
54. A. Alimi, M. Zandieh, M. Amiri, "Multi-objective portfolio optimization of mutual funds under downside risk measure using fuzzy theory" , International journal of industrial engineering computations, pp.859-872, 2012.
55. H. Rahmati, M. Zandieh, "A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.58, pp.1115-1129, 2012.
56. H. Karimi, S. Rahmati, M. Zandieh, "An efficient knowledge-based algorithm for the flexible job shop scheduling problem" , KNOWLEDGE-BASED SYSTEMS, Vol.36, pp.236-244, 2012.
57. H. Mosadegh, M. Zandieh, S. Fatemi ghomi, "Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines" , APPLIED SOFT COMPUTING, Vol.12, pp.1359-1370, 2012.
58. M. Iranpoor, S. Fatemi ghomi, M. Zandieh, "Machine scheduling in the presence of sequence dependent setup times and a rate-modifying activity" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.50, pp.7401-7414, 2012.
59. M. Rabiee, M. Zandieh, A. Jafarian, "Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics setup times and a rate-modifying activity" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.50, pp.7428-7446, 2012.
60. M. Rabiee, M. Zandieh, P. Ramezani, "Bi-objective partial flexible job shop scheduling problem NSGA-II NRGA MOGA and PAES approaches" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.50, pp.7327-7342, 2012.
61. R. Sakiani, S. Fatemi ghomi, M. Zandieh, "Multi-objective supply planning for two-level assembly systems with stochastic lead times" , COMPUTERS OPERATIONS RESEARCH, Vol.39, pp.1325-1332, 2012.
62. S. H., M. Zandieh, "Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.58, pp.309-325, 2012.
63. A. Ayough, M. Zandieh, H. Farsijani, "GA and ICA approaches to job rotation scheduling problem-considering employee s boredom" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.60, pp.651-666, 2012.
64. B. Vahdani, R. Tavakkoli-moghaddam, M. Zandieh, J. Razmi, "Vehicle routing scheduling using an enhanced robust hybrid optimization approach" , JOURNAL OF INTELLIGENT MANUFACTURING, Vol.23, pp.759-774, 2012.
65. F. Pargar, M. Zandieh, "Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times water flow-like algorithm approach" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.50, pp.2609-2623, 2012.
66. H. Mosadegh, S. Fatemi ghomi, M. Zandieh, "Simultaneous solving of balancing and sequencing problems in mixed-model assembly line systems" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.50, pp.4994-5016, 2012.
67. J. Behnamian, S. Fatemi ghomi, M. Zandieh, "Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max min ant system simulated annealing and variable neighbourhood search" , EXPERT SYSTEMS, Vol.29, pp.156-169, 2012.
68. M. Moosavi, M. Zandieh, M. Amiri, "Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.50, pp.2570-2591, 2012.
69. M. Akbari arehkamari, M. Zandieh, B. Dorinokorani, "Scheduling part-time and mixed-skilled workers to maximize employee satisfaction" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.64, pp.1017-1027, 2012.
70. M. Zandieh, "The economic lot scheduling problem with deteriorating items and shortage an imperialist competitive algorithm" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.62, pp.759-773, 2012.
71. A. Sadeghi, A. Alamtabriz, M. Zandieh, "Product portfolio planning-a metaheuristic-based simulated annealing algorithm" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.2327-2350, 2011.
72. A. Boloori arabani, M. Zandieh, S. Fatemi ghomi, "Multi-objective genetic-based algorithms for a cross-docking scheduling problem" , APPLIED SOFT COMPUTING, Vol.11, pp.4954-4970, 2011.
73. B. Naderi, S. Fatemi ghomi, M. Aminnayeri, M. Zandieh, "A study on open shop scheduling to minimise total tardiness" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.4657-4678, 2011.
74. B. Naderi, S. Fatemi ghomi, M. Aminnnayeri, M. Zandieh, "Scheduling open shops with parallel machines to minimize total completion time" , JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, Vol.235, pp.1275-1287, 2011.
75. Z. Zamami amlashi, M. Zandieh, "Sequencing Mixed Model Assembly Line Problem to Minimize Line Stoppages Cost by a Modified Simulated Annealing Algorithm Based on Cloud Theory" , Journal of Optimization in Industrial Engineering, Vol.8, pp.9-18, 2011.
76. A. B., S. F., M. Zandieh, "Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.38, pp.1964-1979, 2011.
77. A. Moradi, S. F., M. Zandieh, "Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.38, pp.7169-7178, 2011.
78. A. Sadeghi, M. Zandieh, "A game theory-based model for product portfolio management in a competitive market" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.38, pp.7919-7923, 2011.
79. A. Bagheri, M. Zandieh, "Bi-criteria flexible job-shop scheduling with sequence-dependent setup times Variable neighborhood search approach" , JOURNAL OF MANUFACTURING SYSTEMS, Vol.30, pp.8-15, 2011.
80. A. Nourmohammadi, M. Zandieh, "Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.2833-2855, 2011.
81. B. Naderi, S. F., M. A., M. Zandieh, "Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.53, pp.751-760, 2011.
82. B. Naderi, M. Zandieh, M. Aminnayeri, "Incorporating periodic preventive maintenance into flexible flowshop scheduling problems" , APPLIED SOFT COMPUTING, Vol.11, pp.2094-2101, 2011.
83. B. Vahdani, M. Zandieh, R. Tavakkoli-moghaddam, "Two novel FMCDM methods for alternative-fuel buses selection" , APPLIED MATHEMATICAL MODELLING, Vol.35, pp.1396-1412, 2011.
84. B. Vahdani, M. Zandieh, V. Roshanaei, "A hybrid multi-stage predictive model for supply chain network collapse recovery analysis-a practical framework for effective supply chain network continuity management" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.2035-2060, 2011.
85. E. Shokrollahpoor, M. Zandieh, B. Dorinokorani, "A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.3087-3103, 2011.
86. H. Moslemi, M. Zandieh, "Comparisons of some improving strategies on MOPSO for multi-objective (r Q) inventory system" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.38, pp.12051-12057, 2011.
87. H. Khorshidian, N. Javadian, M. Zandieh, J. Rezaeian, K. Rahmani, "A genetic algorithm for jit single machine scheduling with preemption and machine idle time" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.38, pp.7911-7918, 2011.
88. H. Mirsanei, M. Zandieh, M. Moayed, M. Khabbazi, "A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times" , JOURNAL OF INTELLIGENT MANUFACTURING, Vol.22, pp.965-978, 2011.
89. H. Moradi, M. Zandieh, I. Mahdavi, "Non-dominated ranked genetic algorithm for a multi-objective mixed-model assembly line sequencing problem" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.3479-3499, 2011.
90. J. B., M. Zandieh, "A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.38, pp.14490-14498, 2011.
91. J. Behnamian, M. Zandieh, S. Fatemi ghomi, "Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min max technique" , SOFT COMPUTING, Vol.15, pp.1313-1331, 2011.
92. M. Moosavi, M. Zandieh, M. Amiri, "An efficient bi-objective heuristic for scheduling of hybrid flow shops" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.54, pp.287-307, 2011.
93. M. Bagher, M. Zandieh, H. Farsijani, "Balancing of stochastic U-Type assembly lines-An imperialist competitive algorithm" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.54, pp.271-285, 2011.
94. M. Zandieh, N. Karimi, "An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times" , JOURNAL OF INTELLIGENT MANUFACTURING, Vol.22, pp.979-989, 2011.
95. N. Karimi, M. Zandieh, A. Najafi, "Group scheduling in flexible flow shops A hybridised approach of imperialist competitive algorithm and electromagnetic-like mechanism" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.4965-4977, 2011.
96. R. S., M. Zandieh, S. F., "Corrigendum to Genetic algorithm for supply planning in two-level assembly systems with random lead times Engineering Applications of Artificial Intelligence 22 (2009) 906 915" , ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, Vol.24, pp.917-918, 2011.
97. S. F., N. Karimi, M. Zandieh, "A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.38, pp.13549-13554, 2011.
98. S. Seyed-alagheband, S. Fatemi ghomi, M. Zandieh, "A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.49, pp.805-825, 2011.
99. B. Naderi, R. Ruiz, M. Zandieh, "Algorithms for a realistic variant of flowshop scheduling" , COMPUTERS OPERATIONS RESEARCH, Vol.2, pp.236-246, 2010.
100. A. B., S. F., M. Zandieh, "A multi-criteria cross-docking scheduling with just in time approach" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.49, pp.741-756, 2010.
101. A. Bagheri, M. Zandieh, A. Mahdavi, M. Yazdani, "An artificial immune algorithm for the flexible job-shop scheduling problem" , FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF GRID COMPUTING THEORY METHODS AND APPLICATIONS, Vol.26, pp.533-541, 2010.
102. A. Moradi, M. Zandieh, "Minimizing the makespan and the system unavailability in parallel machine scheduling problem-a similarity-based genetic algorithm" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.51, pp.829-840, 2010.
103. A. Moradi, S. F., M. Zandieh, "An efficient architecture for scheduling flexible job-shop with machine availability constraints" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.51, pp.325-339, 2010.
104. A. Rashidi, M. J., M. Zandieh, "An improved hybrid multi-objective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.49, pp.1129-1139, 2010.
105. A. T., M. Zandieh, "Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop" , ADVANCES IN ENGINEERING SOFTWARE, Vol.41, pp.1238-1243, 2010.
106. B. Vahdani, R. Soltani, M. Zandieh, "Scheduling the truck holdover recurrent dock cross-dock problem using robust meta-heuristics" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.46, pp.769-783, 2010.
107. B. Naderi, S. Fatemi ghomi, M. Aminnayeri, M. Zandieh, "A contribution and new heuristics for open shop scheduling" , COMPUTERS OPERATIONS RESEARCH, Vol.37, pp.213-221, 2010.
108. B. Vahdani, A. Jabbari, V. Roshanaei, M. Zandieh, "Extension of the ELECTRE method for decision-making problems with interval weights and data" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.50, pp.793-800, 2010.
109. B. Vahdani, M. Zandieh, "Scheduling trucks in cross-docking systems Robust meta-heuristics" , COMPUTERS INDUSTRIAL ENGINEERING, Vol.58, pp.12-24, 2010.
110. B. Vahdani, M. Zandieh, "Selecting suppliers using a new fuzzy multiple criteria decision model-the fuzzy balancing and ranking method" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.48, pp.5307-5326, 2010.
111. H. Kia, H. Davoudpour, M. Zandieh, "Scheduling a dynamic flexible flow line with sequence-dependent setup times-a simulation analysis" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.48, pp.4019-4042, 2010.
112. J. B., S. F., M. Zandieh, "Development of a hybrid metaheuristic to minimizing earliness and tardiness in hybrid flowshop with sequence-dependent setup times" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.48, pp.1415-1438, 2010.
113. J. Behnamian, M. Zandieh, S. F., "Due windows group scheduling using an effective hybrid optimization approach" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.46, pp.721-735, 2010.
114. J. Behnamian, M. Zandieh, S. Fatemi ghomi, "A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.48, pp.4949-4976, 2010.
115. M. Adibi, M. Zandieh, M. Amiri, "Multi-objective scheduling of dynamic job shop using variable neighborhood search" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.37, pp.282-287, 2010.
116. M. Yazdani, M. Amiri, M. Zandieh, "Flexible job-shop scheduling with parallel variable neighborhood search algorithm" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.37, pp.678-687, 2010.
117. M. Amiri, M. Zandieh, M. Yazdani, A. Bagheri, "A variable neighbourhood search algorithm for the flexible job-shop scheduling problem" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.48, pp.5671-5689, 2010.
118. M. Zandieh, A. Mozafari, M. Gholami, "A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems" , JOURNAL OF INTELLIGENT MANUFACTURING, Vol.21, pp.731-743, 2010.
119. M. Zandieh, A. Adibi, "Dynamic job shop scheduling using variable neighborhood search" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.15, pp.2449-2458, 2010.
120. N. Karimi, M. Zandieh, "Bi-objective group scheduling in hybrid flexible flowshop A multi-phase approach" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.37, pp.4024-4032, 2010.
121. R. Soltani, F. Jolai, M. Zandieh, "Two robust meta-heuristics for scheduling multiple job classes on a single machine with multiple criteria" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.37, pp.5951-5959, 2010.
122. S. F., M. Zandieh, "An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.51, pp.1179-1193, 2010.
123. V. R., M. S., M. Zandieh, "Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.37, pp.259-266, 2010.
124. A. Alamtabriz, M. Zandieh, Z. Vaziri sereshk, "A novel simulated annealing algorithm to hybrid flow shops scheduling with sequence dependent setup times" , JOURNAL OF APPLIED SCIENCES, Vol.9, pp.1943-1949, 2009.
125. B. Naderi, M. Zandieh, "Modeling and scheduling a case of flexible flowshops total weighted tardiness minimization" , COMPUTERS INDUSTRIAL ENGINEERING, Vol.57, pp.1258-1267, 2009.
126. B. Naderi, M. Zandieh, H. KH., V. R., "An improved simulated annealing for hybrid flowshops with sequence -dependent setup and transportation times to minimize total completion and total tardiness" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.36, pp.9625-9633, 2009.
127. B. Naderi, M. Zandieh, S. F., "A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling" , JOURNAL OF INTELLIGENT MANUFACTURING, Vol.20, pp.683-694, 2009.
128. B. Naderi, M. Zandieh, V. Roshanaei, "Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.41, pp.1186-1198, 2009.
129. F. J., M. Zandieh, D. Talebi, "Hybrid flexible flowshops with sequence dependent setup times and machineavailability constraints" , COMPUTERS INDUSTRIAL ENGINEERING, Vol.57, pp.949-957, 2009.
130. J. B., M. Zandieh, S. F., "Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.44, pp.795-808, 2009.
131. J. B., M. Zandieh, S. F., "Parallel-machine scheduling problems with sequence-dependent setup times using an ACO and SA hybrid with VNS algorithm" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.36, pp.9637-9644, 2009.
132. J. B., S. CH., M. Zandieh, "A multi phase covering pareto optimal method to multi objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.36, pp.11057-11069, 2009.
133. M. Abiri, M. Zandieh, A. Alamtabriz, "A tabu search approach to hybrid flow shops scheduling with sequence dependent setup times" , JOURNAL OF APPLIED SCIENCES, Vol.9, pp.1740-1745, 2009.
134. M. Gholamy, M. Zandieh, "Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop" , JOURNAL OF INTELLIGENT MANUFACTURING, Vol.20, pp.481-498, 2009.
135. M. Yazdani, M. Gholamy, M. Zandieh, M. Mousakhani, "A simulated annealing algorithm for flexible job-shop scheduling problem" , JOURNAL OF APPLIED SCIENCES, Vol.9, pp.662-670, 2009.
136. M. Amiri, M. Zandieh, B. Vahdani, R. Soltani, V. Roshanaei, "An integrated eigenvector DEA TOPSIS methodology for portfolio risk evaluation in the FOREX spot market" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.37, pp.509-516, 2009.
137. M. Gholami, M. Zandieh, A. Alamtabriz, "Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.42, pp.189-201, 2009.
138. M. Zandieh, B. Dorinokorani, A. Khamseh, "Robust meta-heuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.43, pp.767-778, 2009.
139. M. Zandieh, M. Amiri, B. Vahdani, R. Soltani, "A robust parameter design for multi-response problems" , JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, Vol.230, pp.463-476, 2009.
140. M. Zandieh, M. Gholamy, "An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.47, pp.6999-7027, 2009.
141. M. Zandieh, R. Soltani, B. Vahdani, "A hybrid multi-criteria decision-making model for firms competence evaluation" , EXPERT SYSTEMS WITH APPLICATIONS, Vol.36, pp.12314-12322, 2009.
142. M. Zandieh, S. CH., "Synchronizing production and air transportation scheduling using mathematical programming models" , JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, Vol.230, pp.546-558, 2009.
143. B. Naderi, M. Zandieh, S. F., "Scheduling job shop problems with sequence-dependent setup times" , INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol.47, pp.5959-5976, 2009.
144. B. Naderi, M. Zandieh, S. F., "Scheduling sequence-dependent setup time job shops with preventive maintenance" , INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Vol.43, pp.170-181, 2009.
145. B. Vahdani, A. Alamtabriz, M. Zandieh, "Vendor Selection An Enhanced hybrid fuzzy MCDM Model" , Journal of industrial engineering, Vol.1, pp.31-39, 2009.
146. M. Zandieh, A. Azadeh, B. Haddadi, M. Saberi, "Application of Artificial Neural Networks for Airline Number of Passenger Estimation in Time Series State" , JOURNAL OF APPLIED SCIENCES, Vol.9, pp.1001-1013, 2009.
147. B. Vahdani, M. Zandieh, A. Alamtabriz, "Supplier selection by balancing and ranking method" , JOURNAL OF APPLIED SCIENCES, Vol.19, pp.3467-3472, 2008.
148. M. Amiri, M. Zandieh, B. Vahdani, M. Yazdani, R. Soltani, "A Hybrid MCDM Model with Interval Weights and Data for Convention Site Selection" , JOURNAL OF APPLIED SCIENCES, Vol.15, pp.2678-2686, 2008.
149. M. Mirabi, S. F., F. J., M. Zandieh, "Hybrid Electromagnetism Like Algorithm for the Flow Shop Scheduling Sequence-Dependent Setup Times" , JOURNAL OF APPLIED SCIENCES, Vol.8, pp.3621-3629, 2008.
150. M. Zandieh, I. Mahdavi, A. Bagheri, "Solving the Flexible Job-Shop Scheduling Problem by a Genetic Algorithm" , JOURNAL OF APPLIED SCIENCES, Vol.24, pp.4650-4655, 2008.
151. M. Zandieh, S. M., "Synchronized Production and Distribution Scheduling with Due Widow" , JOURNAL OF APPLIED SCIENCES, Vol.8, pp.2752-2757, 2008.
152. M. Zandieh, S. Fatemi ghomi, S. Moattae husseini, "An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times" , APPLIED MATHEMATICS AND COMPUTATION, Vol.180, pp.111-127, 2006.
153. M. Zandieh, S. F., S. M., "General models for hybrid flow shop sequencing problems with sequence dependent setup times" , Vol.4, pp.1-9, 2005.
154. M. Zandieh, S. Mohaddesi, "Portfolio rebalancing under uncertainty using meta-heuristic algorithm" , International Journal of Operational Research.
155. S. Mousavi, I. Mahdavi, J. Rezaeian, M. Zandieh, "An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times" , Operational Research.
156. S. Mousavi, M. Zandieh, "An Efficient Hybrid Algorithm for a Bi objectives Hybrid Flow Shop Scheduling" , INTELLIGENT AUTOMATION AND SOFT COMPUTING.
157. پ. فتاحي, پ. سموئي, م. زنديه, "الگوريتم انجماد تدريجي چندهدفه جهت مسئله همزمان بالانس خطوط مونتاژ دوطرفه و تخصيص نيروي انساني" , مديريت توليد و عمليات, نسخه 14, صفحات:1-20, 1396.
158. س. خويشتن دار, م. زنديه, ب. دري‌نوكوراني, س. رعنائي سيادت, "ارائه مدل مكان يابي- تخصيص زنجيره تامين چهار مرحله اي بيومتان (مورد مطالعه طراحي زنجيره تامين بيومتان در استان خراسان رضوي)" , مهندسي و مديريت انرژي, نسخه 7, 1396.
159. م. رياحي مدوار, م. زنديه, "بالانس خط دمونتاژ مبتني بر مدل كانو و روش هاي PROMETHEE، M-TOPSIS و Fuzzy-AHP (مورد مطالعه خط بازيافت ضايعات الكترونيكي)" , مطالعات مديريت صنعتي, 1396.
160. م. زنديه, س. مردانلو, "كاوش قوانين پيوستگي كمي در بازار سهام با استفاده از الگوريتم هاي فراابتكاري جندهدفه مبتني بر الگوريتم ژنتيك" , مهندسي مالي و مديريت اوراق بهادار, نسخه 8, صفحات:95-112, 1396.
161. و. حيدرپور, م. زنديه, ح. فارسيجاني, م. ربيعه, "ارائه مدلي براي پيش بيني عملكرد پايانه كانتينر در بنادر با رويكرد پويايي سيستم" , پژوهشهاي نوين در تصميم گيري, نسخه 2, صفحات:109-132, 1396.
162. ح. نقيبي, ح. فارسيجاني, م. كسائي, م. زنديه, "تبيين مولفه هاي تاثيرگذار در ساختار توليد در كلاس جهاني در صنعت خودرو" , پژوهشهاي نوين در تصميم گيري, نسخه 1, صفحات:167-186, 1395.
163. م. اميري, پ. عظيمي, م. زنديه, ف. هادي نژاد, "بهينه سازي قابليت اطمينان تجهيزات و تسليحات نظامي با رويكرد تركيبي شبيه سازي و الگوريتم هاي فراابتكاري" , فصلنامه مديريت نظامي, نسخه 16, صفحات:125-164, 1395.
164. ا. اميرطاهري, م. زنديه, ب. دري‌نوكوراني, "طراحي مدل برنامه ريزي دو سطحي در زنجيره تامين غيرمتمركز توليد- توزيع با در نظر گرفتن تبليغات مشاركتي - مورد مطالعه زنجيره تامين قطعات يدكي خودرو" , مطالعات مديريت صنعتي, نسخه 14, صفحات:1-38, 1395.
165. س. خويشتن دار, م. زنديه, ب. دري‌نوكوراني, س. رعنائي سيادت, "الگوريتم هاي تكاملي براي مسئله مكان يابي تخصيص زنجيره تامين زيست متان" , چشم انداز مديريت صنعتي, صفحات:29-54, 1395.
166. ع. فدائي رفسنجاني, م. ربيعه, م. زنديه, "مدل سازي رياضي استوار انتخاب سبد پروژه و حل آن با كمك الگوريتم NSGA II (شركت گاز استان كرمان)" , مطالعات مديريت صنعتي, نسخه 40, صفحات:53-74, 1395.
167. م. اميري, ح. حداديان, م. زنديه, ع. رئيس زاده, "ارائه مدل معامله هوشمند در بازارهاي مالي مبتني بر الگوريتم ژنتيك، منطق فازي و شبكه عصبي" , مهندسي مالي و مديريت اوراق بهادار, صفحات:37-52, 1395.
168. م. سالاري برون, م. زنديه, "ارزيابي كارايي فروشگاه هاي اينترنتي با استفاده از مدل دو مرحله اي تحليل پوششي داده ها" , پژوهش هاي مديريت در ايران, نسخه 20, صفحات:105-126, 1395.
169. ا. دانشور, م. زنديه, ج. ناظمي, "يك روش تكاملي براي طبقه بندي اعتباري مبتني بر رويكرد تجميع زدايي ترجيحات" , فصلنامه مطالعات مديريت صنعتي دانشگاه علامه طباطبايي, نسخه 13, صفحات:1-34, 1394.
170. ا. عيوق, م. زنديه, "اثر برنامه هاي گردش شغلي سلولي بر عملكرد سلول ناب" , مديريت صنعتي دانشگاه تهران, نسخه 7, صفحات:785-812, 1394.
171. م. ربيعه, م. زنديه, "مدل سازي رياضي استوار انتخاب سبد پروژه و حل آن با كمك الگوريتم NSGA (مورد مطالعه شركت گاز استان كرمان)" , مطالعات مديريت صنعتي, 1394.
172. م. زنديه, آ. فتوت, "زمانبندي سيستم جريان كارگاهي با محدوديت دسترسي ماشين و اثر يادگيري مبتني بر يك مدل تركيبي" , چشم انداز مديريت صنعتي, صفحات:41-58, 1394.
173. م. زنديه, م. خامي, "پيش بيني قيمت سهام با استفاده از تلفيق مدل ماركوف پنهان و زنجيره ماركوف" , چشم انداز مديريت مالي و حسابداري, صفحات:27-40, 1394.
174. ا. مرادي, ا. عالم تبريز, م. زنديه, "تبيين فرايند تحليل شبكهاي ارزيابي عملكرد با رويكرد كارت امتيازي متوازن پايدار" , كاوشهاي مديريت بازرگاني, نسخه 7, صفحات:229-246, 1394.
175. ب. اسلاني, م. زنديه, م. عادلي, "زمانبندي دو هدفه خطوط جريان منعطف بدون وقفه با پنجره زماني تحويل و امكان رد كار" , مديريت صنعتي دانشگاه تهران, نسخه 7, صفحات:445-468, 1394.
176. ا. عالم تبريز, م. زنديه, ا. دوست محمدي, "ارزيابي تاثير به كارگيري نظريه ي محدوديتها بر شاخصهاي عملكردي خط توليد با رويكرد شبيه سازي مورد مطالعه خط توليد دينام خودرو" , فصلنامه مطالعات مديريت صنعتي دانشگاه علامه طباطبايي, نسخه 12, صفحات:7-25, 1393.
177. م. نوتاش, م. زنديه, ب. دري‌نوكوراني, "طراحي چندهدفه شبكه زنجيره تامين با رويكرد الگوريتم ژنتيك" , پژوهشهاي مديريت, نسخه 18, صفحات:183-203, 1393.
178. ا. عيوق, م. زنديه, ح. فارسيجاني, ب. دري‌نوكوراني, "زمان بندي گردش شغلي در سيستم توليد تازه آرايش يافته" , چشم انداز مديريت صنعتي, نسخه 4, صفحات:33-59, 1393.
179. م. زنديه, ا. احمدي, "زمان بندي مقاوم و پايدار براي محيط كار كارگاهي منعطف با شكست تصادفي ماشين" , مديريت صنعتي دانشگاه تهران, نسخه 6, صفحات:511-534, 1393.
180. م. يزداني, م. زنديه, ر. توكلي مقدم, "يك الگوريتم فراابتكاري تركيبي براي مسئله زمان بندي كار كارگاهي منعطف با منابع دوگانه محدود انسان و ماشين" , فصلنامه مطالعات مديريت صنعتي دانشگاه علامه طباطبايي, نسخه 12, صفحات:43-74, 1393.
181. م. زنديه, ر. قوچاني, "اثر حجم معاملات و نسبت بالاي P/E در ايجاد حباب قيمتي در بورس اوراق بهادار تهران" , دانش سرمايه گذاري, نسخه 2, صفحات:71-87, 1392.
182. ب. دري‌نوكوراني, م. اكبري اره كمري, م. زنديه, "زمان بندي دو هدفه شيفت كاري و گردش شغلي كاركنان چند مهارته با رويكرد مهندسي عوامل انساني" , پژوهش هاي مديريت در ايران, نسخه 17, صفحات:1-21, 1392.
183. م. عادلي, م. زنديه, "ارائه رويكرد چندهدفه بهينه سازي شبيه سازي براي مدل منبع يابي و تصميمات موجودي يكپارچه" , چشم انداز مديريت صنعتي, صفحات:89-110, 1392.
184. س. رحمتي, م. زنديه, "توسعه دو الگوريتم چند هدفه براي حل مساله چند هدفه زمانبندي كارگاهي منعطف با در نظر گرفتن توان مصرفي ماهانه" , فصلنامه مطالعات مديريت صنعتي دانشگاه علامه طباطبايي, صفحات:113-137, 1391.
185. م. اكبري اره كمري, ب. دري‌نوكوراني, م. زنديه, "زمانيندي شيفت كاري كاركنان چند مهارته با رويكرد الگوريتم ژنتيك" , چشم انداز مديريت صنعتي, صفحات:89-104, 1391.
186. ح. قجاوند, م. زنديه, ب. دري‌نوكوراني, "به كارگيري الگوريتم هاي فراابتكاري در مدل يكپارچه سازي شبكه لجستيك توزيع كالا" , چشم انداز مديريت صنعتي, نسخه 1, 1390.
187. س. خويشتن دار, ف. فرزد, م. زنديه, "ارائه الگوريتم تكاملي چندهدفه براي سيستم هاي موجودي احتمالي با مرور دائم" , فصلنامه مطالعات مديريت صنعتي دانشگاه علامه طباطبايي, نسخه 8, صفحات:81-99, 1390.
188. س. ميرقادري, م. زنديه, "طراحي يك الگوريتم فراابتكاري جديد براساس رفتار توابع رياضي xcos tanh" , چشم انداز مديريت صنعتي, نسخه 1, صفحات:107-123, 1390.
189. م. راهي, م. زنديه, خ. حسنلو, "تعيين عوامل موثر بر غربال سازي سهام با استفاده از فرآيند تحليل شبكه اي" , چشم انداز مديريت مالي و حسابداري, نسخه 1, صفحات:73-91, 1390.
190. ا. عيوق, م. زنديه, ه. متقي, "ارائه مدل زمانبندي گردش شغلي با ملاحظه هزينه خستگي ناشي از شباهت كارها و توسعه الگوريتم هاي ژنتيك و رقابت استعماري براي حل آن" , مطالعات مديريت - دانشگاه علامه طباطبائي, نسخه 6, صفحات:29-54, 1386.


Conference Articles
1. J. Behnamian, M. Zandieh, S. Fatemi ghomi, "Pareto approach to multi-objective parallel machines scheduling with time window" , 2014.
2. V. Kayvanfar, M. Zandieh, "Economic Lot Scheduling Problem Considering Deteriorating Items" , In International conference on industrial engineering and operations management, 2012.
3. H. Fazlollahtabar, M. Zandieh, "Cost Optimization in an AGV-based Automated Manufacturing System Associated with Product Inspection and Machine Reliability" , In Fifth IEEE International Conference on Research Challenges in Information Science, 2011.
4. J. Behnamian, S. Fatemi ghomi, M. Zandieh, "Hybrid Solving Algorithm for Complex Machine Scheduling Problem" , In 2011 IEEE International Conference on Industrial Engineering and Management Proceeding of the 2011 IEEE IEEM, 2011.
5. V. Kayvanfar, M. Zandieh, I. Mahdavi, "Economic Lot Scheduling Problem with Allowable Shortage A Multi Objective approach" , In 2011 IEEE International Conference on Industrial Engineering and Management Proceeding of the 2011 IEEE IEEM, 2011.
6. V. Khajevand, H. Pedram, M. Zandieh, "Provisioning-based Resource Management for Effective Workflow Scheduling on Utility Grids" , In Fifth IEEE International Conference on Research Challenges in Information Science, 2011.
7. M. Zandieh, "An Imperialist Competitive Algorithm for Simultaneous Solving of Balancing and Sequencing Problems in Mixed-Model Assembly Lines" , 2010.
8. M. Zandieh, "Determine order quantity in two-level assembly systems with random failure rates" , 2010.
9. M. Zandieh, "Economic lot Scheduling problem with deteriorating items and shortage cost" , 2010.
10. M. Zandieh, V. Kayvanfar, "Solving economic lot scheduling problem using extended basic period approach with deteriorating items" , 2010.
11. J. Behnamian, S. Fatemi ghomi, M. Zandieh, "Early tardy scheduling with sequence-dependent setup times on hybrid flowshop using a novel hybrid metaheuristic" , In 19th International Conference on Flexible Automation and Intelligent Manufacturing, 2009.
12. J. Behnamian, S. Fatemi ghomi, M. Zandieh, "Hybrid metaheuristics for a SDST parallel machines scheduling problem with bi-objectives-makespan and sum of the earliness and tardiness" , In 19th International Conference on Flexible Automation and Intelligent Manufacturing, 2009.
13. م. نيكويي, م. زنديه, "زمانبندي توليد در سيستم جريان كارگاهي مونتاژ دو مرحله اي با ساختار دو سطحي محصول و محدوديت دسترس پذيري تجهيزات" دوازدهمين كنفرانس بين المللي مهندسي صنايع, 1394.
14. ا. عيوق, م. زنديه, "مدل سازي برنامه گردش شغلي با تاكيد بر ابعاد رفتاري" هشتمين كنفرانس بين المللي مديريت, 1389.


Shahid Beheshti University

Shahid Beheshti University